MAX4324GESILTIBM Maximo

    Maximo Application Suite - Manage: Preventive Maintenance and Condition Monitoring

    2.0 Presencial-Remoto €0.00

    Descripción

    This 2-day instructor led course provides students with an understanding of how Preventive Maintenance is configured in Maximo Application Suite - Manage including the creation of time and meter based Preventive Maintenance schedules, Master PMs, PM Hierarchies and PM Forecasting. Students will learn about topics such as Repair Facilities and Job Plan Sequencing. This course also has hands-on lab exercises using a Red Hat OpenShift Maximo Manage environment.

    Objetivos

    • Discuss the Preventive Maintenance process and applications
    • Create time-based preventive maintenance schedules
    • Create meter based preventive maintenance schedules
    • Define Job Plan sequencing on a PM
    • Create Master PMs
    • Discuss the usage of Repair Facilities
    • Create Condition Monitoring Points
    • Automatically generate Work Orders from PMs and Condition Monitoring Points

    Audiencia

    Consultants, System Administrators, Support, Sales, Users

    Temario

    Module 1: Introduction to Preventive Maintenance 

    • Discuss the Preventive Maintenance process 
    • Create time-based PM schedules 
    • Create meter-based PM schedules 
    • Define Job Plan sequencing on a PM 
    • Create Master PMs 
    • Discuss the usage of Repair Facilities 
    • Create Condition Monitoring Points 
    • Automatically generate Work Orders from PMs and Condition Monitoring Points 

     

    Module 2: Time Based PMs 

    • Types of Preventive Maintenance 
    • Application Overview 
    • Work Order Configuration 
    • Lead Time 
    • Responsibility Fields 
    • Resource Information 
    • PM Frequency 
    • Fixed vs Floating PMs 
    • PM Alerts 
    • PM Date Calculations 
    • On-Demand and Zero Frequency PMs 
    • Seasonal Dates 

     

    Module 3: Meter Based PMs 

    • Types of Preventive Maintenance 
    • Meter Settings on Main PM Tab 
    • Meter Frequency Settings 
    • Calculating Next Due Dates 
    • Time and Meter Based Frequencies 
    • Meter Rollover 
    • Meter Reading Rolldown and Reset 

     

    Demonstration:  Creating PMs 

     

    Module 4: Job Plan Sequencing 

    • Discuss how to setup job plan sequencing and its different  components 
    • Describe Job Plan Sequencing numbers 
    • Explore the PM counter 
    • Overview of PM forecast 

     

    Module 5: Master PMs 

    • Discuss the concept of the Master PM and associated PMs 
    • Overview of tabs on the Master PM application 
    • Describe  the Master PM with the Rotating Items 
    • Describe the Master PM with Asset Templates 
    • Demonstration:  Creating Master PMs 

     

    Student Exercises: Labs 1-2 PM Options, Master PMs and Time Based PMs 

     

    Module 6: PM Hierarchies  

    • Concept of the PM Hierarchies 
    • PM Hierarchy structure and conditions 
    • PM Hierarchy Processing rule 
    • Creating a PM hierarchy 
    • Removal of a PM from the Hierarchy 

     

    Module 7: PM Forecasting 

    • PM Forecasting Logic 
    • Ways to Generate PM Forecast 
    • Forecast Edit Rules 
    • Deleting Forecast 
    • Impact on Hierarchies and Duplicated PMs 
    • Generating Forecast Costs 

     

    Student Exercises: Labs 4 & 5 - PM Forecasting and Generate WO from a PM 

     

    Module 8: PM Options  

    • Automatic Work Order Generation via a PM 
    • Other PM Options 
    • Demonstration:  PM With Routes 

     

    Student Exercises: Lab 6 – Create Time Based PM with a Route 

      

    Module 9: PMs and Condition Monitoring for Linear Assets  

    • Linear Assets - Recap 
    • PMs using Linear Assets 
    • Condition Monitoring using Linear Assets 

     

    Demonstration:  PM Auto WO Generation Demo 

     

    Student Exercises: Lab 7 – Create a Meter Based PM 

     

    Module 10: Repair Facilities  

    • Enabling Repair Facilities 
    • Capabilities 
    • Configuring a Repair Facility Location 
    • Using Repair Facilities in PMs 

     

    Module 11: Condition Monitoring  

    • Concept of Condition Monitoring 
    • Setting up the Condition Monitoring 
    • Work Order generation from Condition Monitoring 

     

    Demonstration:  Condition Monitoring 

     

    Student Exercises: Lab 8 – Condition Monitoring 

    Related courses

    We transform companies through technology, security and specialized training. Your trusted partner in the digital era.

    Services

    Company

    © 2026 Sinensia. All rights reserved.